Apply Liber & Co's DIY scaling lessons to community solar: practical steps to grow pilots into shared PV projects with SMEs and commercial partners.

From a Stove-Top Syrup to Shared Solar Arrays: A DIY Playbook for Community Energy in 2026

Hook: If your community energy group is stuck on a single rooftop pilot while bills and interest in renewable supply climb, this guide is for you. Learn how the DIY growth lessons from Liber & Co — the cocktail-syrup company that scaled from one pot on a stove to 1,500-gallon tanks and global customers — translate directly into practical steps for scaling community solar projects into larger shared PV schemes with commercial partners and SMEs.

Why this matters now (2026): market context and urgency

Energy prices and volatility remain a core pain point for UK households, landlords and small businesses. At the same time, late-2025 and early-2026 market shifts — wider availability of community finance products, falling battery costs and stronger appetite from corporate partners for local renewable offtake — have created a rare window to scale pilot projects into resilient shared systems.

Instead of waiting for the “perfect” policy environment, community groups can follow a DIY, learn-by-doing trajectory. That’s exactly how Liber & Co grew: start small, iterate quickly, build replicable processes and use demand to unlock partners and finance.

What community solar groups can learn from Liber & Co’s DIY playbook

  • Start with a real pilot: Liber & Co began with a single pot; community groups should begin with a single site that produces measurable data.
  • Own the operations where it matters: doing key tasks in-house builds competency and credibility — useful when negotiating with commercial partners.
  • Standardise and document: repeatable checklists and SOPs cut costs when you scale from 5kW to 500kW arrays.
  • Use revenue to reinvest: cash flow from a pilot validates models and attracts external investors.
  • Partner strategically: Liber & Co retained control while partnering on distribution; community schemes should seek rooftop hosts, local SMEs and corporate offtakers who add value beyond money.

Step-by-step: scaling a community solar pilot into a shared PV project

1. Run a tight pilot that proves the model (0–6 months)

Purpose: gather hard data on generation, export, demand profiles, and stakeholder behaviours. Treat the pilot as a lab, not a permanent solution.

  1. Site selection: choose a host with stable demand (community centre, school, SME) and clear roof access. Get a structural survey and simple shading study.
  2. Metering & data: install generation and export metering from day one. High-resolution data (15-min or 30-min) will be invaluable when designing aggregation and commercial deals.
  3. Start small, optimise quickly: 10–50 kW pilots are often enough to test billing, O&M and community engagement without heavy capex.
  4. Document everything: procurement steps, contractor contacts, permitting times, cost overruns and communications templates.

2. Build repeatable processes (6–12 months)

As Liber & Co discovered moving from pots to tanks, repeatability is the multiplier for scale. Convert the pilot’s lessons into SOPs.

  • Create a standard site assessment checklist (roof condition, orientation, electrical access, planning constraints).
  • Develop an installation playbook (procurement templates, safety briefings, typical labour hours).
  • Standardise the community engagement pack—leaflets, FAQs, benefit calculators for SME tenants and landlords.
  • Set a centralised data dashboard for generation and usage metrics to show impact to potential partners.

3. Secure financing and create a scalable commercial model (12–24 months)

Scaling requires working capital and a clear revenue model. Liber & Co used early sales and self-reinvestment; community projects have more structured options.

Key routes to finance:

  • Community bonds / share offers: local residents and SMEs invest and get a modest return while keeping control.
  • Green loans / community renewables funds: banks and specialist lenders now offer products tailored to community energy (more common since 2025).
  • Commercial partnerships: roof leases or hybrid models where an SME host provides site access and a corporate partner signs an offtake agreement.
  • Third-party ownership (TPO): installer or investor owns the array, rents the roof, and pays community benefits — useful if upfront capital is limited.
  • Crowdfunding platforms and social investment: increasingly used to demonstrate community buy-in and reduce perceived project risk.

Practical tip: prepare a 3-year cash flow that shows baseline savings for an SME host and projected returns for investors. Use your pilot’s real data — investors prefer empirical results to theoretical models.

4. Negotiate commercial partnerships and offtake (12–30 months)

Commercial partners (local manufacturers, supermarkets, landlords, SMEs) bring roofs, customers and credibility. But partnership terms determine who benefits.

  • Define mutual value: landlords get rental income and decarbonisation credibility; SMEs get lower energy costs and PR wins; the community gets income and social value.
  • Use simple templates: a standard Memorandum of Understanding (MoU) for initial commitment and a clear Power Purchase Agreement (PPA) for offtake terms.
  • Clarity on export rights: set mechanisms for on-site consumption, local balancing and export pricing; install smart metering to enable accurate billing.
  • Include an exit and transfer clause: what happens if the host sells the property or the commercial partner changes strategy?

5. Plan for operations, maintenance and scaling logistics (18–36 months)

As Liber & Co moved to 1,500-gallon tanks, supply chain and maintenance became critical. Community projects need that same operational discipline.

  • O&M contract: decide between local installers on retainer vs. self-managed teams for routine checks.
  • Standardise inverter and panel specs: standardise inverter and panel specs to simplify stocking spares and reduce costs.
  • Insurance and warranties: get clear warranties and confirm responsibility for roof repairs and insurance.
  • Billing platform checklist: use or procure a scalable billing solution that supports multiple sites and flexible tariffs.

Financing cheat-sheet: which route suits your group?

  • Low-capex, high control: community bonds + TPO hybrid (community raises some funds; investor owns and pays community benefit).
  • Full control and community ownership: share offer / community benefit society (higher admin but maximum local benefit).
  • Quick scale with less admin: commercial partner funds installation in return for discounted offtake or roof rent.
  • SME-focused supply model: offer tailored PPAs to local SMEs who need price stability — this makes the project bankable faster.
  1. Site surveys and structural certifications (roof load, fire escape routes).
  2. Grid connection capacity and DNO approval routes (export limits, reinforcement risks).
  3. MCS or equivalent installer certification and product warranties.
  4. Clear PPAs or offtake templates for SMEs and commercial partners.
  5. Data governance: consent for energy data sharing, GDPR-compliant billing processes.
  6. Insurance: public liability, equipment cover and business interruption clauses.
  7. Community governance: membership rules, benefit distribution and dispute resolution.

Metering, aggregation and billing — the practical mechanics

Getting metering and billing right unlocks revenue. In 2026 the market offers more aggregation platforms and local energy marketplaces than in previous years. Use them, but verify integration.

  • Smart meters and export meters: install export-capable meters on each site to support accurate local consumption accounting.
  • Aggregation: where permitted, aggregate multiple sites for wholesale access or to match corporate offtakes; your pilot’s data will prove your aggregation logic and wider local energy marketplaces.
  • Billing platform checklist: automated invoicing, tariff flexibility (time-of-use), consumption dashboards for hosts, escrow or ring-fenced accounts for investor cashflows.

Negotiating with commercial partners: tips from the DIY playbook

Liber & Co built a product and then found partners to distribute it — community energy groups should aim for the inverse: build a credible pilot and use that credibility to attract better partners.

  • Show real performance: bring 12 months of generation and usage data to negotiations.
  • Offer compatible benefits: for an SME, the sell is predictable energy costs and green credentials; for a landlord, the sell is rental income and higher asset value.
  • Be prepared to trade: in-kind benefits (e.g., marketing support, free energy for community uses) can lower cash rents.
  • Retain optionality: avoid exclusive long-term clauses that prevent you from evolving the model as you scale.

Risk management — what to watch for when scaling

  • Regulatory risk: stay current with Ofgem and DNO guidance; subscribe to regulator updates or use a legal advisor experienced in community energy.
  • Grid constraints: some parts of the UK still face reinforcement delays; plan site selection with DNO capacity in mind.
  • Financial risk: stress-test your cashflow for lower-than-expected generation and delayed payback.
  • Partner risk: include performance KPIs and transparency clauses in contracts with commercial partners.

Case study vignette: translating a 10 kW pilot to a 200 kW shared array

Imagine a village hall pilot installed in 2024 with a 12 kW PV array. After 18 months, the site produced 10–12% more energy than modelled, and local SMEs expressed interest in discounted offtake for evening use. By documenting installation costs, O&M hours and real generation curves, the community used a share offer to raise 40% of capital and partnered with a local manufacturer who provided rooftop space and a 5-year PPA for part of the output. Standardising the procurement (panels, inverters, mounting), the team installed five more sites of similar size across the area, aggregated the output via a metering platform and negotiated a single operations contract. The result: economies of scale reduced unit capex by 18% and enabled a modest community dividend alongside stable SME tariffs.

  • More tailored finance: expect more lenders to offer community-specific green loans and grant programmes, following increased investor interest in decentralised energy.
  • Battery + solar combos are standard: with falling storage costs, combined PV+storage will be the default for new shared arrays to increase self-consumption and resilience.
  • Aggregation and local markets grow: improved platforms and regulatory clarity are making local energy marketplaces more practical.
  • Corporate offtakes rise: SMEs and local corporates increasingly sign local PPAs for both cost certainty and green credentials.

Actionable checklist: your next 90 days

  1. Run a diagnostic: gather 12 months of energy bills and 2–4 weeks of generation data from your pilot.
  2. Draft standard documents: create site assessment, MoU and PPA templates.
  3. Map partners: identify 3 potential commercial hosts and 2 local SMEs for offtake trials.
  4. Prepare funding pitch: 3-year cashflow, pilot data and a clear community benefit statement.
  5. Choose a metering/billing platform trial: prioritise platforms with export aggregation capability.

“The hands-on, learn-by-doing culture that helped Liber & Co scale its production is exactly what community energy groups need: start small, standardise fast and partner smart.”

Closing: scale like a scrappy maker, govern like a cooperative

Liber & Co’s trajectory — from a single pot to global supply — is a lesson in the power of iterative improvement, operational ownership and strategic partnerships. Community energy groups should adopt the same hybrid approach: retain the DIY ethos to build trust and capability, and then use standardisation and strategic commercial partnerships to scale.

In 2026, with evolving finance, cheaper storage and more aggregation tools, the moment to upgrade your pilot into a shared PV project is now. Use real data, standardised processes and smart partnerships to reduce costs for local SMEs, generate community income and lock in resilience against rising energy prices.

Ready to scale? Your next move

If you have a pilot and want a practical roadmap tailored to your sites, start by sending your pilot data and a short brief to our team. We connect community groups with vetted installers, financing options and commercial partners, and provide templates you can reuse for every new site.

Call to action: Contact us today to get a free 90-day scaling plan and a downloadable checklist to move from pilot to shared PV in under 18 months.

Advertisement

Related Topics

#community-energy#business#case-study
p

powersupplier

Contributor

Senior editor and content strategist. Writing about technology, design, and the future of digital media. Follow along for deep dives into the industry's moving parts.

Advertisement
2026-01-24T12:04:00.904Z